For Australian carpenters

Quote the deck on-site. Get the deposit before you order the timber.

Decks, pergolas, framing and doors. Sumitt builds a sharp carpentry quote in minutes, then texts your client a link to accept, e-sign and pay the deposit.

No spam. Your details go to Sumitt so we can reply, and are deleted after 90 days if you never sign up. Privacy policy

✕ Quoting decks off memory and last year’s timber prices
Current editable rates that build the total as you tap
✕ Forgetting fixings, demolition and the balustrade
Every small line ready to add, nothing given away
✕ Ordering timber before any money lands
Deposit paid and e-signed before you cut a board
01
Quote on-site

Your rate card builds the price while you walk the job. No kitchen-table maths at 9pm.

02
They tap one link

Your client opens the quote on their phone, picks an option and e-signs.

03
Deposit before you start

They pay the deposit on the same link, so the money is in your account before you begin.

Read from the code, not written by marketing

Built for carpenters, not adapted for them

Every figure below is read from the Carpentry rate card, takeoff engine and hazard library inside Sumitt when this page renders. It cannot say more than the product does, and it moves the day the card does.

The Carpentry rate card

Size field: Deck / build area (m²)

18 lines in 5 groups, 4 switched on before you touch anything, 5 with a grade or billing basis to pick.

  • Decking & outdoor
  • Framing & interior
  • Doors & trim
  • Site
  • Labour
  • Decking supply + install: Treated pine, Merbau / hardwood, Composite (Ekodeck/ModWood)
  • Deck stairs (per riser): Treated pine, Merbau / hardwood
  • Old deck demolition + removal: per m², per day, per hour

Australian guide rates factored across 10 regions, every one of them editable. Guidance, not gospel.

The takeoff engine

Say it like this. The engine reads the scope, works out the quantities, prices them off your card and tells you what it assumed. Deterministic arithmetic; no AI touches the numbers.

  • “20 m2 merbau deck, 5 steps, 12 lm balustrade, remove old deck”
  • “hang 3 internal doors and 25m of skirting”
  • “30 m2 merbau deck”

The safety pack

A SWMS drafted from the job you priced, with the carpentry hazard set on top of the common site hazards.

  • Cutting & machining
  • Nail guns & fixing
  • Deck & frame work at height

Priced lines add their own: Waste disposal & tip runs.

Extra PPE: Respirator (P2) when cutting treated timber or MDF; Ear protection for saws and nail guns.

3 site questions to confirm before sign-off.

You review it against the site, edit it and sign. Sumitt prepares the paperwork; it does not assess your site or make your business compliant. Safety packs are part of Pro, and the free trial includes Pro.

Price books

Import your supplier’s or wholesaler’s price list and quote from real trade prices instead of a guide rate. Every line stays editable on the quote.

Books, exports and the rules

Paid invoices land in Xero as drafts, and quotes, invoices and payments export as CSV. Sumitt warns when a total crosses a Queensland, New South Wales or Victorian licence line, and never blocks.

The Trade Rate Index shows the benchmark cost of the jobs carpenters quote most and the rates that leave a floor, healthy or premium margin, derived from the same rate cards. Not a survey, not advice.

Asked by carpenters

Straight answers

Does it price decks by board grade?

Yes. Decking supply and install comes in treated pine, merbau and composite at their own rates, stairs per riser in pine or hardwood, with balustrade, pergola frames, substructure-only rebuilds, demolition and fixings as lines. Framing, LVL beams, doors, skirting and gates cover the second fix.

Can I say the deck and get a draft?

Type or say the size, the board, the steps and the balustrade and the engine sets the quantities and prices them off your card. Mention the old deck and demolition and disposal come with it. The arithmetic is deterministic, not an AI guess.

Does the SWMS cover nail guns and height?

The carpentry hazard set covers cutting and machining, nail guns and fixing, and deck and frame work at height, with sequential-trigger, guard and edge-protection controls. The high-risk questions ask about height, nail guns and load-bearing alterations. You review and sign.

Do I get the deposit before the timber order?

Yes. The client opens the quote link, picks a package, e-signs and pays the deposit by card or marks a bank transfer, and the job opens with its paper trail. Variations are priced and approved in writing when the scope grows.

Sumitt provides software and templates, not legal, financial or tax advice.

Built for AU carpenters. Decks, pergolas, framing and second fix, priced properly.