For tilers in Victoria

Quoting app for tilers in Victoria

Tiles, adhesive, grout, waterproofing and removal. Sumitt builds the tiling quote in minutes and your client accepts and pays from their phone.

The VICdeposit cap, licence line, payment-claim rules, variation rules and rates below are read from Sumitt’s own tables when this page renders, not written for it.

No spam. Built for AU trades. Free to start.

Read from Sumitt’s own law tables

The rules in Victoria that Sumitt already knows

Every rule below is read, when this page renders, from the tables the quote builder, the variation composer, the extension-of-time notice and the payment-claim generator run on. Sumitt warns and never blocks, and the page moves the day a table does.

Deposit cap in Victoria

VIC caps deposits at 10% on domestic building jobs under $20,000.

VIC caps deposits at 5% on domestic building jobs of $20,000 and over.

Sumitt's default deposit is 10% of the total including GST. It warns you when a deposit goes over the line; it does not enforce it.

Domestic Building Contracts Act 1995 (Vic)

Licence line in Victoria

Sumitt carries a licence line for Victoria at $10,000: a quote over it with no licence number on file gets a hard warning in the builder. It warns, it does not block.

Security of Payment claims in Victoria

Sumitt turns an overdue invoice into a payment claim under the Building and Construction Industry Security of Payment Act 2002 (Vic). If the contract is silent, the client has 10 business days to give a payment schedule.

The claim carries the endorsement wording the Act requires.

A claim can be served from the last day of the month the work was done in (one claim per month), up to 6 months after practical completion or the later date your contract allows.

It does not cover a job for a homeowner who lives or will live in the home. Sumitt asks who the invoice is addressed to and says so before you serve one.

Building and Construction Industry Security of Payment Act 2002 (Vic)

Variations in Victoria

In Victoria the variation rules Sumitt shows are cited to Domestic Building Contracts Act 1995 (Vic) ss 37 and 38.

A variation needs a written notice describing the change and its effect on the price and the completion date.

Both parties sign before the varied work begins (s 37 covers builder-initiated changes, s 38 owner-requested ones).

In Victoria a builder generally cannot recover for a variation that skipped the written process unless VCAT grants an exception, and the 2026 reforms tighten variation paperwork further. Paper first, tools second.

A signature before the varied work starts is a statutory element there, not just good practice.

Sumitt structures the variation and collects the signature, a record you keep, not legal advice. Where your contract sets its own variation process, follow it too.

Domestic Building Contracts Act 1995 (Vic) ss 37 and 38

Extensions of time in Victoria

In Victoria the contract sets the extension-of-time window. Sumitt's notice defaults to 10 calendar days from the day the delay ended, shows the countdown, and asks you to check the contract's own figure.

A template you serve in your own name, not legal advice. Your contract's own extension-of-time clause governs the window and the grounds, so check it and keep a copy of everything.

Sumitt provides software and templates, not legal, financial or tax advice. Check what applies to your contract.

Trade Rate Index

What the work costs in Melbourne / VIC metro

Sumitt's Melbourne / VIC metro card is the national card: materials and labour both at 1.00. Outside the metro the Regional (freight + travel) card applies: materials 1.08, labour 1.03.

JobCostFloorHealthyPremiumHealthy, Melbourne / VIC metro
Bathroom retileper · benchmark scope: 12 m2 bathroom porcelain retile$282$331$402$470$402Check your rate
Porcelain floorper · benchmark scope: 25 m2 porcelain floor$152$178$216$253$216Check your rate

National figures per unit, ex GST, derived from Sumitt’s 2026 rate cards priced over the benchmark scope shown under each job; the last column prices the same scope on the Melbourne / VIC metro card. Cost is the benchmark cost of doing the work before any margin, and Floor, Healthy and Premium are the sell rates that land those margins. Not a survey of what anyone else charges, and nothing here reflects what any Sumitt user charges. How to read it, and the method, are on the index.

Read from the code, not written by marketing

Built for tilers

Every figure here is read from the Tiling rate card, takeoff engine and hazard library inside Sumitt when this page renders, so it cannot say more than the product does.

The rate card

15 lines in 3 groups, 4 with a grade or billing basis to pick. Size field: Area (m²). Every rate editable.

  • Tiling
  • Prep
  • Labour

The takeoff engine

Say it like this and the engine prices it off your card, deterministically.

  • 12 m2 bathroom porcelain retile
  • 25 m2 porcelain floor
  • 20 m2 ceramic floor

The safety pack

A SWMS drafted from the job you priced, with the tiling hazard set:

  • Substrate prep & waterproofing
  • Cutting & laying tiles

2 site questions to confirm before sign-off.

You review it against the site, edit it and sign. Sumitt prepares the paperwork; it does not make your business compliant.

The full breakdown, with the graded options, the line-triggered hazards and the PPE, is on the tilers page.

Asked by tilers in Victoria

Straight answers

What deposit can tilers take in Victoria?

VIC caps deposits at 10% on domestic building jobs under $20,000. VIC caps deposits at 5% on domestic building jobs of $20,000 and over. Under the Domestic Building Contracts Act 1995 (Vic). Sumitt's default deposit is 10%. Sumitt warns you when a quote goes over it, it does not enforce it. Not legal advice.

Is there a licence threshold for tilers in Victoria?

Yes. Sumitt carries a licence line for Victoria at $10,000: a quote over it with no licence number on file gets a hard warning in the builder. It warns, it does not block. Not legal advice.

Can tilers make a Security of Payment claim in Victoria?

Yes. Sumitt turns an overdue invoice into a payment claim under the Building and Construction Industry Security of Payment Act 2002 (Vic). If the contract is silent, the client has 10 business days to give a payment schedule. It does not cover a job for a homeowner who lives or will live in the home. Sumitt asks who the invoice is addressed to and says so before you serve one. Not legal advice.

Do variations need to be in writing in Victoria?

In Victoria the variation rules Sumitt shows are cited to Domestic Building Contracts Act 1995 (Vic) ss 37 and 38. A variation needs a written notice describing the change and its effect on the price and the completion date. In Victoria a builder generally cannot recover for a variation that skipped the written process unless VCAT grants an exception, and the 2026 reforms tighten variation paperwork further. Paper first, tools second. Sumitt prices the variation and collects the client's e-signature, and flags a running job with an unapproved variation. Not legal advice.

Sumitt provides software and templates, not legal, financial or tax advice.

Made for AU tilers. Floor, wall and wet-area work, priced right.