Trade Rate Index · Bricklaying & blocklaying

What bricklaying & blocklaying work really costs, and what to charge over it

For the bricklaying & blocklaying jobs quoted most: the benchmark cost of actually doing the work, and the sell rates that land a floor, healthy or premium margin, on the national card and on every regional card. All ex GST, derived from Sumitt's 2026 rate cards. Type your own rate into the checker to see where you sit.

← Back to the full index
How to read it. Cost is what the reference job costs to do in an average Australian region, per unit, before any margin. Floor is a 15% margin on the price (the house minimum). Healthy is 30% and Premium is 40%. The spread column shows how the healthy rate moves from region to region. These are guides built from cost for your own pricing, not a survey of what anyone else charges, and not advice.

Bricklaying & blocklaying: the benchmarks

JobCostFloorHealthyPremiumHealthy, by region
Face brick veneer wallper m² · benchmark scope: 45 m2 face brick veneer wall$142$168$203$237$193 to $229Adelaide / SA metro → Darwin / NTCheck your rate
Core-filled blockworkper m² · benchmark scope: 30 m2 besser blockwork core filled$225$265$321$375$308 to $369Adelaide / SA metro → Darwin / NTCheck your rate

The healthy rate, card by card

The same reference scope, priced on each regional rate card at the healthy margin, ex GST. Each card has its own material and labour factor against the national average.

Rate cardMaterialsLabourFace brick veneer wallCore-filled blockwork
Australia-wide average (default)1.001.00$203$321
Sydney / NSW metro1.061.14$224$341
Melbourne / VIC metro1.001.00$203$321
Brisbane / SEQ1.041.06$214$335
Perth / WA metro1.031.02$209$330
Adelaide / SA metro0.960.94$193$308
Canberra / ACT1.051.12$221$338
Hobart / TAS1.000.96$199$321
Darwin / NT1.151.10$229$369
Regional (freight + travel)1.081.03$215$347

Method. Every figure is derived, not surveyed. Sumitt’s 2026 regional rate cards price the reference scope shown under each job, with the same takeoff engine the app quotes with. Each rate is then set so the margin is a share of the price, not a markup on cost. The first eleven trades were recalibrated in July 2026 against named supplier prices. Carpentry, roofing, bricklaying and rendering were calibrated when they were added in August 2026, and formwork when it was added in September 2026. All figures ex GST. The regional spread uses the same rate cards’ material and labour factors. No AI, no user data, and nothing here reflects what any Sumitt user charges.

These are the current edition’s figures. The edition and the day it was published are on the index. Rates are a guide for your own pricing, not gospel and not advice. Your costs are the ones that matter, and every number stays editable in Sumitt.