What concrete & paving work really costs, and what to charge over it
For the concrete & paving jobs quoted most: the benchmark cost of actually doing the work, and the sell rates that land a floor, healthy or premium margin, on the national card and on every regional card. All ex GST, derived from Sumitt's 2026 rate cards. Type your own rate into the checker to see where you sit.
← The full indexConcrete & paving: the benchmarks
| Job | Cost | Floor | Healthy | Premium | Healthy, by region | |
|---|---|---|---|---|---|---|
| Plain slab / pathper m² · benchmark scope: 40 m2 plain concrete | $111 | $130 | $158 | $184 | $151 to $180Adelaide / SA metro → Darwin / NT | Check your rate |
| Exposed aggregate drivewayper m² · benchmark scope: 60 m2 exposed agg driveway 100mm | $134 | $157 | $191 | $223 | $182 to $216Adelaide / SA metro → Darwin / NT | Check your rate |
| Shed slabper m² · benchmark scope: 50 sqm shed slab | $123 | $145 | $176 | $206 | $168 to $200Adelaide / SA metro → Darwin / NT | Check your rate |
The healthy rate, card by card
The same reference scope priced on each regional rate card, ex GST, at the healthy margin. Each card carries its own material and labour factor against the national average.
| Rate card | Materials | Labour | Plain slab / path | Exposed aggregate driveway | Shed slab |
|---|---|---|---|---|---|
| Australia-wide average (default) | 1.00 | 1.00 | $158 | $191 | $176 |
| Sydney / NSW metro | 1.06 | 1.14 | $171 | $206 | $192 |
| Melbourne / VIC metro | 1.00 | 1.00 | $158 | $191 | $176 |
| Brisbane / SEQ | 1.04 | 1.06 | $165 | $200 | $185 |
| Perth / WA metro | 1.03 | 1.02 | $162 | $196 | $181 |
| Adelaide / SA metro | 0.96 | 0.94 | $151 | $182 | $168 |
| Canberra / ACT | 1.05 | 1.12 | $169 | $204 | $190 |
| Hobart / TAS | 1.00 | 0.96 | $156 | $189 | $174 |
| Darwin / NT | 1.15 | 1.10 | $180 | $216 | $200 |
| Regional (freight + travel) | 1.08 | 1.03 | $168 | $204 | $187 |
Method.Every figure is derived, not surveyed: Sumitt’s 2026 regional rate cards (the original eleven trades recalibrated July 2026 against named-supplier pricing; carpentry, roofing, bricklaying and rendering calibrated on their addition in August 2026) are priced over the reference scope shown under each job by the same deterministic takeoff engine the app quotes with, then grossed up to each margin level. All figures ex GST. Regional spread uses the same rate cards’ material and labour factors. No AI, no user data, and nothing here reflects what any Sumitt user charges.
These are the current edition’s figures; the edition label and its publication date are on the index. Rates are guidance for your own pricing, not gospel and not advice; your costs are the ones that matter, and every derived number stays editable inside Sumitt.